×
This information is available only to subscribers. Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Camisea

This project is now in operation and will therefore be updated upon request only.
Related news articles will still appear in our news service and in the news feed below.
Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Project Details

Description

The Camisea project comprises Peru's largest gas fields, with 11.2tn cubic feet in reserves. It involves three different phases, of which the first is exploration, to be carried out by Pluspetrol in blocks 56 and 88 and in the San Martin and Cashiriari fields. The second stage is transportation, to be carried out by Transportadora de Gas del Perú (TGP), and involves the construction of a 714km natural gas pipeline and a 540km pipeline for liquids. The third phase for distribution will be carried out by Cálidda and involves the delivery of energy to Lima and Callao. Camisea will benefit the energy industry in Peru, as well as helping the environment by reducing levels of greenhouse gas emissions. A total of US$6.3bn has been invested since the Camisea project began in 2004. The companies involved in the project are: Pluspetrol (27.2%), the owner of the deposit, Hunt Oil (25.2%), SK Energy (17.6%), Tecpetrol (10%) and Repsol (10%). TGP is controlled by Colombia's Empresa de Energía de Bogotá (23.6%), Spain's Enagas (22.38%), Algeria's Sonatrach (21.18%), Korea's SK Corp (11.19%), the Canada Pension Plan Investment Board (10.4%), GDF Suez (8.06%), local construction company Graña y Montero (1.67%) and the IFC (1.51%). The capacity of a third pipeline is being expanded to 850Mpc/d by TGP and is expected to be completed in the first quarter of 2015. Block 88 is also being expanded at a cost of US$480mn, which includes 2D and 3D seismic, exploration and injection wells and a natural gas transport line. This expansion is expected to start during 2014.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Locked content
Locked content
Locked content
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Camisea
Project Type
Conventionals, Exploration, LNG, Natural gas and condensates, Onshore
Development Phase
In operation
Project Status
Active
Project Capacity
 Conventionals
 Exploration
45,471  LNG
 Natural gas and condensates
 Onshore
Investment
US$ 7bn
Lifespan
40
Location

The project is located in the La Convención province, State of Cusco, Peru.

* The map coordinates provided represent the approximate latitude and longitude, and not the exact location, of the project in question.


Locked content
Owner / operator
Locked content
Maintenance Manager
Locked content
Country Manager
Locked content
Assistant Manager
Dear visitor, this table includes insights that is only available for subscribers
Advertising