Loading...

We found 390 Results
Click & drag to scroll 
  • Cancura wind farm

    12/9/16
    The project entails the construction of a wind farm that will comprise 12 wind turbines of 3.3MW each, and a transmission line (which will be presented to Chilean authorities separately) that will inject the energy into the national...

  • Ccollpani hydropower plant

    4/21/17
    The Ccollpani hydropower plant project involves the construction of a hydroelectric power station, which will inject electricity into the national SEIN grid. The project is being developed by Empresa de Generación Ccollpani S.A.C,...

  • Mostazal solar park

    12/13/16
    The project involves the construction of a solar park, which will have 33,600 solar panels of 320Wp each, and a 15kV transmission line. Power produced would be injected into the national SIC grid. Estimated output is 19.4GWh/y....

  • Chile approves substation project

    8/25/16
    Chile's Antofagasta region (II) environmental authority approved a US$40mn substation project planned by Chilean transmission firm Saesa. The Kimal substation will be located approximately 19km outside the town of María Elena, and...

  • Fotoelectricidad Loa

    6/22/17
    The project involves the construction of a photovoltaic and thermosolar park that will cover around 3,993ha. It is expected to take five years to complete and will require a workforce of up to 1,500 people. The energy produced will be ...