Loading...

We found 15,789 Results
Click & drag to scroll 
  • Bolt Energias S.A.

    4/28/17
    Bolt Energias was established in 2010 and is based in Brazil. The company's activities revolve around project development and operation of power generation assets. The company is involved in projects related to conventional...

  • Hanwha Q CELLS GmbH

    4/28/17
    Hanwha Q CELLS Co. Ltd. is a solar module manufacturer headquartered in South Korea. The company is the result of the 2015 merger between Hanwha SolarOne and Hanwha Q CELLS. Outside of the Asian market the company has operations in...

  • Rubí solar plant

    4/28/17
    The project calls for the construction of a solar central, that is expected to provide 440GWh/y, preventig the emission of about 270,000t of CO2 into the atmosphere. The energy produced will be injected into the national SEIN grid...

  • Olmué solar park

    4/28/17
    The project calls for the construction of a solar park that will be connected to the national SIC grid. It also entails the building of a 220kV transmission line that will run for 2.8km and connect Parque Solar Olmué to the existent...

  • PV Lilen

    4/28/17
    This project consists of the construction and operation of a photovoltaic (PV) park, which will supply a total nominal 78MW to Chile's central grid. Construction is due to begin in 2016. The project is being developed by PV...

  • Tamarugal Solar SpA

    4/28/17
    Tamarugal Solar SpA is a subsidiary of the US-based firm SolarReserve LLC. aimed at the development of renewable energy projects, through its local branch SolarReserve Chile S.A. The firm is developing the Concentrated Solar Power...

  • Vergara wind farm

    4/28/17
    The project invovles the construction of a wind farm that will inject 110GWh/y of energy into the national SIC grid. The construction stage is expected to take up to 12 months and during this period up to 30 jobs are expected to be...

  • La Estrella Wind Farm

    4/28/17
    The La Estrella wind park project involves the construction and operation of a wind farm comprising 20 aerogenerators of 2.5MW each for total installed capacity of 50MW, a step-up substation, a 110kV transmission line of around 1.6km...