Loading...

We found 36,963 Results
Click & drag to scroll 
  • Campo Largo IV wind farm

    6/23/17
    Campo Largo IV, part of the 327MW first phase of the Campo Largo wind complex, will operate with 2.7MW capacity Alstom ECO 122 wind turbines. The towers will be 89m in height while blade length will be 59.3m and rotor diameter, 122m....

  • Campo Largo III wind farm

    6/23/17
    Campo Largo III, part of the 327MW first phase of the Campo Largo wind complex, will operate with 2.7MW capacity Alstom ECO 122 wind turbines. The towers will be 89m in height while blade length will be 59.3m and rotor diameter, 122m. ...

  • Carnaúbas wind farm

    6/23/17
    The Carnaúbas project, part of the 108MW São Miguel do Gostoso wind complex, is a wind farm in the northeast region of Brazil. It involves the construction and operation of 9 generating units, each providing 3MW of capacity. The...

  • Sol del Loa solar plant

    6/23/17
    The project consists of three stages of development, the first involving 20MW, the second 40MW and the final stage 50MW. It will employ a maximum of 60 workers during the construction stage and 16 as permanent staff when in operation....

  • Tulumayo IV hydro plant

    6/23/17
    The project involves the construction of a 56.2MW hydro plant and a 4.7km tunnel to be built along the Tulumayo river in Peru's Junín region. It will also include the construction of a 220kV transmission line connecting the...

  • Alstom Power

    6/23/17
    Alstom Power, a division of French engineering and power services group Alstom, is focused on the design, manufacture, procurement and servicing of power generation plants and equipment, as well as carrying out a wide range of turnkey ...

  • UEP Penonomé II, S.A.

    6/23/17
    UEP Penonomé II S.A. is a Panamanian subsidiary of InterEnergy Holdings, a power generation and fuel and electricity distribution company in Latin America and the Caribbean. Panama City-based UEP Penonomé II has built and is operating ...